Estimating and bid support for general contractors

Bids scoped, leveled and rolled up before bid day.

Wick Construction takes on the work between the plan set and your number: division scopes and RFQs, sub outreach, estimating RFIs, bid leveling and the final roll-up. Your team keeps every pricing decision.

Based in Dallas, Texas.

Div 26 Electrical · Leveling Example
Scope lineBidder ABidder BBidder C
Base bid182,400168,900175,200
Fire alarmDiv 28Incl.+14,500Excluded, pluggedIncl.
Temporary powerIncl.Incl.+3,200Excluded, plugged
Lighting controlsIncl.Incl.Incl.
Leveled total182,400183,400178,400Low leveled
Bidder B came in $6,300 under Bidder C. With fire alarm added back, C is low by $5,000. Example figures.

What we do

Two ways to use us

Hand us the whole bid, or just the sub bids you've already collected. Either way, every bid gets checked against the same scope.

Plan set to roll-up

Full bid management

We run the bid so your team can keep running jobs.

  • Scope sheet and RFQ for every division
  • Sub invitations, follow-up and addenda tracking
  • Estimating RFIs, sent before the RFI deadline
  • Leveling for every division
  • Bid clarifications and the final roll-up
Sub bids to roll-up

Bid leveling

You collect the sub bids. We make them comparable.

  • Every bid checked against the plans and specs
  • Exclusions flagged and missing scope plugged
  • Questions to subs when a number doesn't add up
  • Clarifications for your proposal
  • Final roll-up by division

Every scope line cites the sheet or spec section it came from, such as E-201 or 26 05 19, so your estimator can check it against the drawings.

How a bid runs

From plan set to your number

The same five steps on every job. Full bid management covers all five; bid leveling starts at step 4.

  1. 01

    Send the documents

    Plans, specs and addenda, or add us to the project in your plan room.

  2. 02

    Scope and RFIs

    We split the job by division, write each scope and send you the RFIs before the deadline.

  3. 03

    Sub outreach

    RFQs go out with the scope attached. We follow up and track addenda.

  4. 04

    Leveling

    Each bid is checked line by line. Exclusions are flagged and missing scope gets a plug.

  5. 05

    Roll-up

    You get division totals, recommended subs and clarifications. Your team sets the final number.

Free sample

See it on a job you're bidding now

Send us a project on your board and we'll return the electrical package at no charge, so you can judge the work before you hire us. The earlier in the bid window you send it, the more useful the RFIs.

Request a free sample
  • Electrical scope sheetXLSX
  • RFI list, price-affecting items firstPDF
  • Leveling sheet, ready for your electrical bidsXLSX

Fees

Most of the fee is due only when you win

  • SampleFree. One division on a job you're bidding.
  • UpfrontA small fee per bid, quoted in writing before we start.
  • On awardA success fee, due only on jobs you win. The upfront fee is credited toward it.
  • Your numbersWhen we run a bid for you, we don't work for a competing GC on the same project.

About

Who does the work

Wick Construction is a Dallas company run by Neil Wickham, a project manager with more than 20 years in commercial construction. He has bid and built medical, restaurant, fitness and retail tenant finish-outs across the country.

Neil reviews every scope, RFI and leveling sheet before it goes to you.